Transformation of 1.6km of existing concrete channel into a natural waterway. The channel is located in a heavily urbanised catchment and works will take place over five years of staged construction. The community has been actively involved in the design of the waterway works through a range of community workshops and events held early in the design process. For further information, download the case study below